Akshi-tie-beam-work

AKSHI: TIE BEAM WORK AFTER PILE CAP CASTING

14-09-2022: Akshi is our Individual 3BHK residential project near NKDA Cricket Stadium, Action Area II, New Town. After piling work, lifting  pillars/columns from each pile cap has been started. Now tie beam work is being done to strengthen the foundation of the new building. The first roof is expected to be cast before Durga Puja.Currently, 4th floor flat is available. More details at:...

Force Eight: Foundation work going on

07-09-2022: Force Eight is our HIG Co-operative near Derozio College, Action Area II, New Town. After piling work, lifting  pillars/columns from each pile cap has been started. Now tie beam work is being done to strengthen the foundation of the new building. The first roof is expected to be cast in a few...

Shanti Pile Cap 05-09-2022

Shanti: Pile Cap work under process

07-09-2022: After the completion of the piling work of Shanti Co-operative, now the pile cap work is being done. Under each pile cap there are two or three piles, which are about 60 feet underground. Pile caps create a stable foundation and offer a larger area for the distribution of the building load onto the piles. They act in a similar way to piled raft foundations, where a concrete slab rests on soil...

GST-Rates-on-Property

Real Estate Sector under GST

Real estate is an important pillar of the Indian economy. Under the earlier tax regime, various taxes like VAT, service tax, stamp duty, and registration charges were paid by the buyers.However, under GST a single rate of 12% is applicable on under construction properties whereas no GST is applicable on completed or ready to sale properties only if the Completion Certificate (CC) has been issued.In March...

Ektara: 4th Floor Roof Casting

* {box-sizing: border-box;} body {font-family: Verdana, sans-serif;} .mySlides {display: none;} img {vertical-align: middle;} /* Slideshow container */ .slideshow-container { max-width: 1000px; position: relative; margin: auto; } /* Caption text */ .text { color: #f2f2f2; font-size: 15px; padding: 8px 12px; position: absolute; bottom: 8px; width: 100%; text-align: center; } /*...

Uttar Falguni: Inside & Outside Plaster Done

3rd August 2022: Internal and external plaster work of the 'Uttar Falguni' has been completed. The door frame work is also done. After that the work of flooring will start. It is hoped that we will be able to hand over the keys of the new flats to all buyers before the end of this year. * {box-sizing: border-box;} body {font-family: Verdana, sans-serif;} .mySlides {display: none;} img...

Abash Bhumi Puja

Neelkamal (AA-201) Bhumi Puja

Today(3rd  August,2022)  we organized bhumi puja for the construction of a new building for Neelkamal LIG  Co-operative in AA Block near New Town Water Treatment plant. After that the piling work has started. It will take possession of the plot in Eighteen...

Compare listings

Compare